The problem
A machine shop wanted to maximize productivity while maintaining a high
level of product quality. The
solution
Seco-Carboloy of Detroit assembled a Productivity Improvement Team (PIT
Crew) to train machine operators, analyze current cutting parameters and
review several machining operations. As a result, the team suggested
several specific improvement initiatives. The
result
In one operation, the company had been using an indexable insert drill to
drill initial holes, then roughed out the hole with an indexable carbide
end mill. The PIT Crew suggested helical milling, eliminating the drilling
operation. The change saved approximately 40 hours in machining time. The
documentation
Click on the following links (example
1, example
2, example
3) to see sample documentation that Seco-Carboloy used to demonstrate
productivity increases totaling nearly $60,000. The
story
Click here to read how
Seco-Carboloy won the 2003 Value-Added Partner of the Year Award from the
Industrial Supply Manufacturers Association.
|